Neuss (PN / Sp). Under the economic stimulus package of new fire station of the North will be realized. Mayor Herbert Napp was now for the groundbreaking ceremony for the new building on the property Osterrath corner Bockholt street in the presence of the department heads for the fire, Ernst-Horst Goldammer, Head of the Department for Construction, Stefan Pfitzer, and many members of the Neuss-fire, especially the Truck Furth . The building was like the fire station and Grefrath Uedesheim designed by the architectural firm Wichmann. It consists of two buildings, a machine hall and a two-storey wing for changing rooms, accommodation and training rooms. At both buildings have different requirements regarding equipment, fire safety and indoor climate. These requirements, the buildings are differentiated in their shape and material selection. Thus, the changing area is formed as solid in a conventional design with a rendered facade and large windows. The engine room for four fire engines replaced by a metal façade an industrial look. The contrast between the monolithic plaster construction, from a more traditional and typical local materials, and industrial impact of the vehicle determines the outer hall of the building. A glazed connecting wing is also the "lock" between the engine room and adjacent rooms and allows access to the rear area. The new building will be completed in late October.The building has a floor space of over 610 square meters on a nearly 4,000-square-meter plot of land. The changing area with showers and toilets are designed for up to 55 people, the training rooms for 60 persons. The total cost is inclusive of the establishment cost of 47,000 € to € 1.75 million.
No comments:
Post a Comment